Tell us what you are planning. Floor plans are mandatory: without them we cannot scope the survey.
Q2. Which type of survey do you require? (choose one)
Desktop Survey Performed off site to predict AP numbers/locations to meet coverage requirements
Issue Identification Survey Carried out to identify and prove if poor coverage or other issues are affecting service
Full Planning Survey Greenfield survey of premises with no or very little Wi-Fi coverage (new build/refurb or similar)
Post Install Survey Carried out after WLAN implementation to confirm coverage meets requirements
Q3. Which type of environment/s applies to this survey? (choose all that apply)
Restricted Office (secure buildings, and/or old buildings)
Open Plan Office (standard modern workspaces)
Warehouse/Factory (any industrial space, typically with safety considerations)
Medical/Pharmaceutical (typically hospital areas)
Academia (schools, colleges etc.)
Q4. Which type of wireless service(s) do you plan to implement?
Fundamental Data (web browsing and email)
High Performance Data (Teams, video/music streaming and big data)
Advanced Services, Asset Tracking, Wayfinding, Real-Time Location Services (RTLS)
Q5. Do any other areas require surveying?
Car Parking/Loading Bay Areas - to be marked on floor plans to define areas
Outdoor areas used by staff or visitors - to be marked on floor plans to define areas
Other - please describe below
Q6. What are the approximate sizes of those areas requiring coverage?
Q7. Electronic copies of all building/site floorplans are mandatory.
PDF or DWG preferred. Please ensure coverage areas are indicated on the plans, otherwise we assume all areas are required.
Q8. Will you require resilient coverage from access points?
Certain services will inherit resilient coverage from access points by virtue of their necessary coverage requirements.
Q11. Are there any areas where usage could be considered very-high capacity?
Q12. Will the works be conducted during normal working hours?
Surveying often requires walking the same area multiple times, which can cause disruption.
Q13. Will any installs likely be required at heights greater than 3 metres?
Exact placement may not be known yet. Lobby areas, factories and warehouses often need access points at height.
Q14. Will you require photos of proposed AP locations?
Photos are not provided by default as delivery significantly increases cost, and the value of such data is often questionable.
Q15. Will you require surveying for new structured cabling and/or testing of existing structured cabling?
If no options are selected, we do not include cabling specific deliverables in our work.
Structured Cabling Testing
Structured Cabling Survey
Other (please specify)
Q16. Do you require data capture concerning communication room(s)?
If checked, we assess the requested aspects in prospective AP next-hop cabinets, where these are easily accessible and no onsite constraints exist. If no options are selected, we do not include active network switching equipment checks in our work.
Available cabinet space (in "U")
Available cabinet power (quantity of free outlets only)
Available switch ports (we check empty sockets only, excluding capability)
Switch PoE+ hardware capability (this does not necessarily validate function)
Other (please specify)
Q17. Are there any known limitations to the physical location of access points?